| 1 | Process Suitability | Is the component suitable for cold forging rather than machining, warm forging, or hot forging? | The supplier should review the part geometry, material ductility, required production volume, surface requirements, and acceptable deformation ratio before recommending a process. | Manufacturability review, preliminary process route, part drawing review, and written assumptions. | The best process depends on geometry, material, quantity, tolerances, and tooling cost—not only on the target unit price. |
| 2 | Technical Specifications | Which drawing standard, revision, dimensions, tolerances, and inspection datum will be used? | All dimensions, geometric tolerances, surface requirements, edge conditions, thread details, and revision levels should be clearly identified before quotation and production. | Controlled engineering drawing, specification sheet, inspection plan, and signed sample approval record. | A quotation should not be based on an incomplete drawing or an uncontrolled revision. |
| 3 | Raw Material | What material grade, input wire or bar size, and material condition will be used? | The supplier should state the material designation, applicable standard, incoming size, surface condition, heat-treatment condition, and traceability method. | Material certificate, heat or batch traceability record, incoming inspection report, and chemical composition report when required. | The exact material designation should be agreed in writing because similar trade names may have different chemical or mechanical requirements. |
| 4 | Tooling | Who owns the dies, punches, and other dedicated tooling, and what is included in the tooling quotation? | The supplier should identify tooling materials, expected service conditions, maintenance responsibility, replacement terms, storage arrangements, and ownership after payment. | Tooling drawing, tooling quotation, ownership clause, maintenance plan, and tool-life monitoring record. | Tooling cost is normally separate from recurring part price and may be amortized over an agreed order quantity. |
| 5 | Quality Control | How will dimensional accuracy, cracks, laps, seams, folds, decarburization, and surface defects be controlled? | The supplier should define inspection frequency, measurement equipment, sampling method, critical characteristics, visual standards, and acceptance criteria. | Quality control plan, first-article inspection report, capability data where applicable, and nonconformance procedure. | Cold forging can improve material utilization, but forming defects may still occur if tooling, lubrication, alignment, or material condition is not controlled. |
| 6 | Heat Treatment and Finishing | Are heat treatment, thread rolling, plating, coating, deburring, or other secondary operations required? | The supplier should list every operation, process sequence, subcontracting arrangement where relevant, performance requirement, and inspection responsibility. | Process flow chart, heat-treatment report, coating or plating certificate, hardness report, and final inspection report. | Secondary operations can affect dimensional stability, corrosion resistance, fatigue performance, and total lead time. |
| 7 | Samples and Approval | What sample quantity is required, and what constitutes approval before mass production? | The supplier should confirm sample quantity, production conditions used for samples, inspection scope, approval deadline, and the procedure for handling sample deviations. | Sample submission package, dimensional report, material certificate, functional test results, and approved reference sample if applicable. | Samples produced with temporary tooling may not represent final production capability unless this limitation is disclosed. |
| 8 | Minimum Order and Capacity | What are the minimum order quantity, monthly capacity, available machine sizes, and capacity allocation policy? | The supplier should state whether the minimum quantity is driven by setup, material purchase, tooling amortization, or production economics, and should identify realistic capacity for the required delivery schedule. | Capacity statement, production schedule, equipment list, and proposed batch-size plan. | A lower unit price may require a larger batch, while split deliveries can reduce inventory pressure but may add logistics costs. |
| 9 | Lead Time | What is the lead time for tooling, samples, first production, repeat orders, and any required finishing? | The supplier should separate engineering, tooling, raw-material procurement, sample production, approval, mass production, finishing, and shipping time. | Milestone schedule, production plan, agreed purchase-order lead time, and escalation contact details. | Lead time should be stated in calendar or working days and should clarify when the clock starts. |
| 10 | Packaging | How will the parts be protected against corrosion, impact, contamination, and count discrepancies during international transport? | The supplier should define inner packaging, outer cartons or pallets, corrosion protection, moisture control, identification labels, net and gross weights, and packaging validation. | Packaging specification, packing list, carton photographs, pallet dimensions, and approved packaging sample. | Packaging should be suitable for the selected transport mode and the expected storage and handling conditions. |
| 11 | Shipping Terms | Which Incoterms® rule, named place, transport mode, and insurance responsibility will apply? | The supplier should quote using a clearly stated Incoterms® 2020 rule and named place, and explain which party handles export clearance, main carriage, import clearance, duties, taxes, and insurance. | Commercial quotation, pro forma invoice, freight quotation, and agreed Incoterms® clause. | An Incoterms® rule allocates transport-related responsibilities, but it does not replace the sales contract or determine ownership transfer. |
| 12 | Customs Documentation | Which documents will be provided for customs clearance and import compliance? | The supplier should confirm availability of the commercial invoice, packing list, transport document, certificate of origin when required, material documents, and any applicable compliance declarations. | Commercial invoice, packing list, bill of lading or airway bill, certificate of origin, and product-specific certificates where applicable. | HS classification, import permits, duty rates, and local requirements should be verified with the buyer’s customs broker or relevant authority. |
| 13 | Freight Planning | What are the shipment dimensions, gross weight, number of packages, and estimated ready date? | The supplier should provide shipment-ready data before booking freight and notify the buyer of any changes to quantity, dimensions, or weight. | Final packing list, carton or pallet dimensions, gross and net weights, and cargo-ready notice. | Accurate packing data helps avoid freight re-quoting, documentation amendments, and customs delays. |
| 14 | Inspection Rights | Can the buyer or an appointed third party inspect the goods before shipment? | The supplier should confirm inspection timing, access arrangements, sampling standards, measurement methods, reporting format, and the process for resolving rejected findings. | Inspection procedure, agreed acceptance criteria, inspection report, and corrective-action record when needed. | Pre-shipment inspection reduces shipment risk but does not replace supplier process control or the buyer’s incoming inspection. |
| 15 | Traceability | Can each shipment be traced to its raw-material batch, production date, tooling, inspection records, and finishing lot? | The supplier should define the lot numbering system and retention period for production, material, inspection, and subcontracting records. | Lot traceability procedure, batch labels, production records, inspection records, and certificate cross-reference. | Traceability is especially important for safety-critical, regulated, or high-volume applications. |
| 16 | Payment and Risk | What payment milestones apply to tooling, samples, production, and shipment, and what happens if approval is delayed? | The supplier should provide a clear payment schedule, currency, bank-charge responsibility, quotation validity, cancellation terms, and treatment of approved tooling or work in progress. | Quotation, purchase contract, tooling agreement, payment schedule, and change-control clause. | Payment milestones should be linked to verifiable deliverables such as tooling completion, approved samples, or shipment documents. |
| 17 | After-Sales Support | What is the procedure for shortages, dimensional nonconformity, transit damage, or delayed delivery? | The supplier should define notification periods, evidence requirements, containment actions, replacement or rework options, credit arrangements, and corrective-action timing. | Quality agreement, warranty or claims procedure, nonconformance report, root-cause analysis, and corrective-action report. | The contract should distinguish manufacturing defects from transport damage and define responsibility for each case. |