Contact us
Leave Your Message
Products Categories
Featured Products

O.D. 4-1/2", Thread Type 3-15/16"-6Acme-2G, Bottom Sub for Perforating Guns

The O.D. 4-1-1/2" Bottom Sub is a critical part of the perforating gun assemblies found in the oil and gas sector. Meant to link the perforating guns with the rest of the wellbore tools, it plays an integral part in the smooth and effective perforation of the well during the completion of the latter. The 3-15/16" - 6Acme-2G threading of the bottom sub ensures a firm and durable fit, even during harsh temperature and pressure environments. Its heavy-duty construction ensures that it will be able to sustain the harsh environments of the deep-well application.

    Material

    This bottom sub has a heavy strength alloy steel with fatigue strength, wear resistant and resistant against corrosion. The metal also receives specialized heat treatment that further enhances the strength and life and consistency of the metal. This guarantees that it matches the rugged environments of the perforating operation with a durable operation with uncomplicated efficiency and safety.

    Specifications

    • Outer Diameter (O.D.): 4-1/2 inches
    • Thread Type: 3-15/16"-6Acme-2G
    • Material: Premium strength steel that has been heat-treated
    • Pressure Resistance: Assigned to act at good high-pressure conditions
    • Length: Customizable based on the customer’s specific perforating gun needs
    • Weight: Designed with a top strength-to-weight ratio with ease of installation in mind

    Sub O.D.

    Thread Type

    Pressure Rating

    Approx. Weight

    4-1/2"

    3-15/16"-6Acme-2G

    25,000 psi [172Mpa]

    26.5lb [12kg]

    Production Processes

    The O.D. 4-1/2" Bottom Sub is produced through a series of well-controlled processes to meet industry standards:
    1. Forging: Initially forged with top-grade alloy steel in order to build a strong foundation of the part.
    2. CNC Machining: CNC machined with great precision to the required dimension and thread specification. The machining guarantees smooth fitting with the rest of the perforating gun assemblies.
    3. Thread Cutting: The 3-15/16"-6Acme-2G threads are professionally cut into the sub so that the connections will be smooth and leakage free and tight.
    4. Heat Treatment: The lower sub also receives a heat treatment that maximizes strength and wear and fatigue resistance in an effort to perform effectively in a highly stressing environment.
    5. Surface Finishing: The sub is also smoothened during the surface finishing and this avoids wear and tear and enhances the surface strength against harsh working environments.
    • Bottom subs_4
    • Bottom subs_1

    Quality Test & Inspection

    Every O.D. 4-1/2" Bottom Sub has undergone exhaustive testing to meet the highest standards of safety and quality. The testing includes:
    • Dimensional Check: The individual part goes through rigorous measuring to ensure that it adheres to the required standards of the thread pitch and the external diameter.
    • Pressure Testing: The sub is pressurized with artificial pressurization testing such that it will be able to bear the stresses of the perforating operation.
    • Material Testing: The tensile strength and hardness of the steel alloy are subjected and assured against the harsh operation standards required.
    • Thread Integrity: Threads are scrutinized closely with respect to consistency and accuracy in an effort to enable correct fitting and leakage-proof fit in the field.

    Key Features

    • Robust Construction: Made of heat-treated steel alloys that promise stronger and lasting construction.
    • Precision Threads: The 3-15/16"-6Acme-2G thread design ensures a tight, secure connection with other perforating tools, preventing leaks.
    • High-Pressure and Temperature Resistance: Designed to operate at the elevated pressure and temperature environments normally found during the course of oil and gas wellbore activities.
    • Customizable Length: Specially designed for particular perforating gun systems with the provision of variability for varied well-completion requirements.

    Industry Applications

    The O.D. 4-1-2" Bottom Sub has excellent application in the petroleum and petroleum products business and excellent application in the petroleum and petroleum products business
    • Well Completion: Through the construction of perforations in the casing that enable passage of fluids during the recovery of the gas and the oil.
    • Fracturing and Stimulation: The lower sub is utilized in the processes of acidizing and hydraulic fracturing and ensures that the perforating system performs effectively in such a rigorous application.
    • Deep Well Operations: It is perfectly suited for deep-well perforating with the typical scenario of a harsh environment and a higher pressure.

    Packaging and Storage

    Once the O.D. 4-1/2" Bottom Sub has passed the final checks of quality assurance, it will be properly packed with good protecting materials not to get damaged during shipping and handling. Care and attention of the required storage conditions; the part should be placed in a clean and dry environment not to rust and get spoiled. The sub should also be properly handled not to get damaged with regards to the thread.

    Shipment

    The O.D. 4-1/2" Bottom Sub has a shipping system that guarantees it will be delivered promptly to the customer all over the world. The shipping package guarantees that the item will not get damaged during shipping and has an option of track-and-deliver at an additional charge. The item has an instant installation option that guarantees that the perforating operation will be done effectively and with minimal downtime.

    Leave Your Message